Retrocommissioning (RCx):
The process of systematic investigation to identify improvements in
existing building, and offer low cost solutions in a effort to increase
building performance. Many of it's activities are similar to Cx,
but it occurs after construction is complete.
Retrocommissioning Goals:
Reduce Energy Cost
Optimize Building Performance
Enhance O&M Documentation
Improve Facility O&M procedures.
Capabilities
Energy Building energy simulation using DOE Energy Plus 1.2.2.
Audit & optimize existing building control & energy management
systems.
Mechanical equipment functional testing.
Fire, Life Safety & Leak Detection functional testing.
IP & Network infrastructure audit.Please review our
Retrocommissioning Activities Check
List below.
Understand Owner's Objectives.
Understand the owner's "Needs & Wants" & Goal.
Retrocommissioning Plan.
Generate a Retrocommissioning plan. The plan will outline detailed
activity list, geared towards meeting owner's objective as defined.
Ideally the Retrocommissioning plan will include the following tasks:
1. Define Owner's Requirements.
Define the requirements by system; based on the established objectives.
2. Survey site, understand existing systems, and establish
a base line.
3. Energy Simulation.
Using simulation software, DOE EnergyPlus V1.2.2, to generate a building
energy model.
4. Functional Performance Test Procedures
and Checklists.
Develop functional performance test procedures and verification check
lists.
5. Supervise Functional Tests &
Analyze Results.
Analyze & understand test results. Verify that the system
operates per the criteria designed for.
6. Compiling, Recommendations &
Reporting.
Generate a report identifying the systems recommissioned, energy simulation
results, functional test results & improvement recommendations based
on our investigative results.
7. Training.
Identify training criteria, and organize training for the appropriate
personnel.
8. Documentation Manuals.
Gather & organize all documentation of existing systems, including:
operation & maintenance manuals for systems involved, 'as-built'
drawings.
9. Recommissioning Management Manual.
Develop a recommissioning manual to include: recommended recalibration
frequency of sensors & equipments, guidelines for establishing and
tracking benchmarks for systems performance.
|